The next part of the project will involve installing a pool at the top of the catchment area to slow incoming water and direct it south along the swale along the road and west downhill into the flower bed. Both areas are lined with drainrock and then larger tumbled round rock will be laid in on top. For the catchment pool we had to pull out one of the cotoneaster shrubs, remove the stump and then back fill with soil and drainrock.