Blog

Monthly Archives: 02/2015

Work on Rain Garden & Redwood Steps continues

Posted on by Surprise Highway
Filed under: Water, Design, Build

Work by volunteers and interns continues on two projects in the garden. Soil/road base from the rain garden/french drain project has been dug out and replaced with rocks collected in the garden to capture and slow rain water to flow through into the garden beds on the slope above the lawn.  Meanwhile the displaced road base is sent to the new redwood steps project in the Redwood grove to back fill the new hand hewn redwood stair risers.