ADA path project nearly complete
We are now finishing the last details of the ADA path project. We decided to keep the trail that cuts off the ADA Path toward the headhouse. A sloped trail through beds of succulents on the sunny side and ferns under the oak is connected to the concrete construction with a fan shaped redwood set of steps designed and built by staff, volunteers and students.
Stonework below Redwood Grove
The steep path has been altered to go around the outcropping of illite rock just below the redwood grove. Mike, one of our staff has designed and built the path made from concrete pieces reclaimed from the disassembled parking structure near the house.