Creek Restoration Phase 1

Posted on by Surprise Highway
Filed under: Water, Restoration, Design, Build,

Phase one of the creek restoration project has started. We are covering the steep banks with jute mesh and securing it with redwood branches and stone pine stakes: debris recycled/reused from the garden. This process will help with erosion control. Next we will be planting riparian plant species on the hillside. The concept is that when these water loving species drop their roots into the ground they will hold the soil on the bank while simultaneously  natural materials will rot.