ADA path project nearly complete

Posted on by Surprise Highway
Filed under: Education, Design, Build,

We are now finishing the last details of the ADA path  project. We decided to keep the trail that cuts off the ADA Path toward the headhouse. A sloped trail through beds of succulents on the sunny side and ferns under the oak is connected to the concrete construction with a fan shaped redwood set of steps designed and built by staff, volunteers and students.